dash bg

Here Are Our Latest Projects

Back to Top
Back to Project Gallery

North Miami Senior High School

Miami, FL

    dash bg
    Project Overview

    This project involved the construction of a new 390,000 square-foot, state-of-the-art campus with athletic fields.

    The new campus sits on a 16.52 acre site and accommodates 3,000 students. The existing school sat on half of the site, and remained fully operational throughout the construction process, making the coordination of delivery of materials, safety and noise level control vital components of this project. The project was divided into three phases. Phase One involved construction of the new buildings. These structures included three Classroom/Administration/ Science Lab buildings, a gymnasium and an auditorium/ cafeteria. In Phase Two, the existing high school was demolished while the students occupied the new buildings from Phase One. Phase Three involved the construction of the athletic fields, comprising a 400-yard track, two long jumps, two high jumps, four basketball courts and a football field. Some notable features of the new school are an auditorium utilized by the community for local plays, a gymnasium with a 2,000-person capacity and a three-story parking garage containing 251 spaces.

    • K-12 icon
      Sectors K-12
    • owner icon
      Owner Miami-Dade County Public Schools
    • architect icon
      Architect Zyscovich Inc
    • square icon
      Square Feet 390,007