Sector
Residential
Owner
The Abbey Group
Architect
Bruner/Cott & Associates, Inc.
Square Ft.
390,000

Suffolk’s preconstruction planning was critical to getting this job out of the ground quickly. The project required deep-hole excavation approximately 55 feet down for the building’s four levels of below-grade parking. The team utilized soldier pile lagging, a pressure mat at the bottom of the hole, and a complete concrete structure. 

"Building of America Gold Medal Award," (2010)